Reconstruction of waste water treatment plants and pumping stations

Reconstruction of Lustivere waste water treatment plant in Põltsamaa Preparation of detailed design; part technology, procurement and installation of equipment
Tartu city waste water treatment plant Reconstruction of the biological sludge treatment plant. Procurement and installation of aeration equipment. Procurement of composting equipment
Reconstruction of the waste water treatment plant of Järvakandi settlement Preparation of detailed design; part technology, procurement and installation of equipment
Construction of on-site treatment plant for production residue water for OÜ Viru Kalatööstus Preparation of detailed design, installation of equipment, process adjustment
Rakvere city waste water treatment plant, consultation Elimination of bacilli using chlorine treatment – consultation, industrial testing
Paide city waste water treatment plant, consultation Reconstruction of the biological sludge treatment plant. Procurement and installation of aeration devices, consultation; improvement of sediment properties of the organic mud with contact election
Rapla city waste water treatment plant, consultation Stopping the mass reproduction of bacilli using chlorine treatment, consultation, industrial testing
Reconstruction of the sewerage pumping station at the Valkla care home Procurement and installation of equipment, electricity and automatics work
Reconstruction of the waste water treatment plant at Kupiskis city (Lithuania) Biological sludge treatment plant, preparation of detailed design, procurement and installation of equipment
AS Werol Tehased waste water treatment plant in Painküla, reconstruction Biological sludge treatment plant, procurement and installation of equipment
Reconstruction of the sewerage pumping station at Ülemiste in Tallinn Installation of pipes and piping, equipment
Construction of the sewerage pumping station on Õitse street in Tallinn Procurement and installation of pumping station equipment, installation of piping
Reconstruction of sewerage pumping station at Kiviõli settlement Procurement and installation of equipment, installation of piping
Akzo Nobel sewerage pumping station construction in Tallinn Installation of pipes and piping, equipment
Tori-Selja Piimaühistu, Selja settlement and cheese manufacture, waste water treatment plant reconstruction   – 5000 ie Biological sludge treatment plant. Preparation of detailed design, part technology, procurement and installation of equipment and piping
Kõrgessaare rural municipality, Viskoosa settlement and fishery waste water treatment plant reconstruction, 12500 ie Reconstruction of the biological sludge treatment plant. Preparation of detailed design, procurement and installation of equipment, production and installation of constructions. Procurement and installation of receiving station
Reconstruction of rainwater sewerage pumping station at Tartu mnt 99, Tallinn Procurement and installation equipment, installation of pipes and piping, equipment
Reconstruction of the waste water treatment plant of Kääriku Procurement and installation of the metal constructions
Construction of sewerage pumping stations in Pärnu city Procurement and installation of contact pumping station
Treatment of biodegradable waste of Ambla rural municipality Preparation of development plan for treatment of biodegradable waste in Ambla rural municipality
AS Biodiesel Paldiski, construction of on-site treatment plant for production waste water Preparation of detailed design
Nõo settlement, waste water treatment plant for meat processing plant, 4400 ie Reconstruction of biological sludge treatment plant, procurement and installation of equipment
Reconstruction of pumping station at Lossi street in Põltsamaa Procurement and installation of equipment, installation of piping
Reconstruction of waste water treatment plant in the city of Priportovo (Ukraine), 16,000 ie Reconstruction of mud treatment (aerobic stabilisation), procurement and installation of technology and equipment
Ilyichevsk city waste water treatment plant (Ukraine) Reconstruction of biological sludge treatment plant, selecting the technology, procurement and installation of equipment
Waste water treatment plant in Bar city (Ukraine), 18,000 ie Preparation of preliminary technological project
Technology for the waste water treatment plant of the city of Ukrainka (Ukraine), 13,000 ie Preparation of technological draft project for sludge treatment plant reconstruction
Technology for the waste water treatment plant of the city of Pervomaysk (Ukraine), 50000 ie Preparation of preliminary project documentation (technology). Preparation of waste water treatment plant detailed design (waste water pre-screening station)
Põltsamaa town waste water treatment plant,  phase I of reconstruction 16,000 ie Reconstruction of biological sludge treatment plant, procurement and installation of equipment
Procurement and installation of mud treatment equipment, technological adjustment
Production and installation of metal constructions
Construction of the sewerage pumping station at Hiiu in Tallinn Installation of pipes and piping, equipment.
Reconstruction of the boosting station at Keila Installation of pipes and piping, equipment
Waste water treatment plant at Rockhammar paper mill (Sweden) Procurement and installation of aeration equipment
Waste water reconstruction plant in Duvbacken (Sweden) Reconstruction of aeration system. Procurement and installation of equipment
Reconstruction of the waste water treatment plant of Pärnu city. Reconstruction of mud processing station. Procurement, installation, and adjustment of equipment
Installation of piping
AS Tallinna Vesi waste water treatment plant Procurement of equipment for reconstruction of mud processing equipment
Kodila waste water treatment plant Procurement and installation of equipment
Reconstruction of the waste water treatment plant of Põltsamaa town and food industry, phase II of expansion 25000ie Preparation of detailed design, part technology procurement and installation of devices (aeration, mud processing, pre-screening sieve of the decanter), process adjustment;
construction and installation of the metal constructions
Construction of sewerage pumping stations in Paide. Installation of pipes and piping, equipment
Treatment plants at Põltsamaa rural municipality Construction of foreign mud receiving station
Construction of Aseri town waste water treatment plant 2300 ie Preparation of detailed design, part technology, procurement and installation of equipment and technical piping, process adjustment
Reconstruction of Vändra waste water treatment plant 4300 ie Equipment for waste water pre-screening, aeration and mud processing equipment – procurement and installation
Construction of Kohila waste water treatment plant 5000 ie Preparation of detailed design, part technology, constructing SBR treatment plant, installation of technical equipment, process adjustment
Reconstruction of Loksa waste water treatment plant 10000 ie Preparation of detailed design, part technology, procurement and installation of equipment and technical piping, technological process adjustment
OÜ Estover Juustutööstus, reconstruction of Kaarlijärve waste water treatment plant, phase II 18000 ie Preparation of detailed design, part technology, procurement and installation of equipment and technical piping, technological process adjustment
Haljala settlement, construction of AS Viru Õlu waste water treatment plant 22000 ie Installation of technological equipment and piping, technological adjustment of the SBR process.
Reconstruction of the waste water treatment plant of Ääsmäe settlement 1900 ie Preparation of detailed design, part technology, installation of technological equipment and piping, technological process adjustment
Reconstruction of the floatation station of the AS E-Piim dairy manufacture Preparation of detailed design, procuring of equipment, installation of technological equipment and piping
Obtaining of composting equipment for waste treatment station of Rakvere city Procurement of mud composting device, implementing windrow composting
Reconstruction of Kambja waste water treatment plant 750 ie Preparation of detailed design, part technology (SBR technology), procurement and installation of equipment and technical piping, technological process adjustment
Reconstruction of waste water treatment plant of Viljandi 40000 ie Reconstruction of mud processing system. Manufacture and installation of equipment, installation of piping.
Construction of discharge station at Põltsamaa rural municipality Detailed design. Procurement and installation of equipment, installation of piping
Construction of waste water treatment plant at Väätsa settlement 750 ie Preparation of detailed design, part technology, procurement and installation of equipment and technical piping, technological process adjustment