ASERI WWTP

ANDRITZ D2L C30 BHP,

Biological activated sludge

Concentration: 0.8 – 1.2%

Capacity : 5m3/h

Cake: 23%

VÄNDRA WWTP

ANDRITZ D2N C30 BHP,

Biological activated sludge

Concentration : 2.5–3.5%

Cake: 23%

KEILA WWTP

ANDRITZ D3L C30 BHP,

Biological activated sludge

Concentration : 2.5–3.5%

Cake: 18–19%

VALGA WWTP

ANDRITZ D3L C30 BHP,

Biological activated sludge

Concentration : 2.5–3.5%

Cake: 18–20%

LOKSA WWTP

ANDRITZ D2LL C30 BHP,

Biological activated sludge

Concentration : 1.5 –2%

Cake: 23%

KAARLIJÄRVE WWTP – Rannu, Tartu County
(AS Estover Piimatööstus)

ANDRITZ D3LL C30 BHP,

Biological activated sludge+
chemical sludge

Concentration : 3–6%

Cake: 18–20%

HALJALA WWTP (Haljala settlement and AS Viru Õlu production)

ANDRITZ D2LL C30 BHP,

Biological activated sludge

Concentration : 1.6–2%

Cake: 20%

KURESSAARE WWTP

ANDRITZ D3LL C30 BHP

Biological activated sludge pre-thickening

KURESSAARE WWTP

ANDRITZ D3LL C30 BHP, 2 devices

Anaerobic (methane fermented) sludge

Concentration : 3%
Cake: 25%

KURESSAARE WWTP

ANDRITZ D3LL C30 BHP, 2 devices

Anaerobic (methane fermented) sediment mud

Concentration of sediment mud: 3%
Dewatered mud: 25%

VÄÄTSA WWTP

ANDRITZ D2N C30 BHP,

Biological sludge

Concentration : 1.7–2.0%

Cake: 23%